Development of Patan - Deesa Road Km. 95/5 to 134/325 S.H. No. 7 (Pravasipath) |
Executive Engineer, R and B Division, Patan (D.R. Agrawal Infracon Pvt. Ltd.) |
12 Months |
4635.51 |
2 |
|
Package No.-10 Construction of 95 Shops + 448 E.W.S. + 560 L.I.G. type multistoried residential flats including development work at Hathijan,Ahmedabad |
Gujarat Housing Board (P.S.P. Projects Ltd.) |
24 Months |
3541.97 |
3 |
|
Koth - Arnej - Jawaraj - Gundi Road Km. 0/0 to 14/600. (Widening existing 7.0 mt. to 10.0 mt., C. D. Work and other work) |
Executive Engineer R & B Division Ahmedabad |
12 Months |
2214.42 |
4 |
|
Lingada - Bhalej - Anand Road Km.0/0 to 19/2 (Proposed Work- widen from 5.50 mtr. and 7.00 mtr. to 10.00 mtr. and Strengthening ) ( Aggrement No. : B-2/26 /2013-14 ) |
Executive Engineer R & B Division, Anand |
12 Months |
2139.09 |
5 |
|
Widening & Strengthening Vansi - Borsi - Machhiwad Road Km. 0/0 to 10/4, District Navsari |
Executive Engineer, Navsari (R&B) Division, Navsari |
12 Months |
2124.76 |
6 |
|
Improvement to Ukai Right Bank Main Canal Between Ch.15072 mt. to 25000 mt. (Package-10) |
S.S.N.N.L. ( Kunal Structure India Pvt. Ltd. ) |
12 Months |
2079.17 |
7 |
|
Periodical Renewal to Km. 162/0 to 169/0 (Up Lane) & 148/5 to 169/0 (Down Lane) & 175/6 to 181/925 (Down Lane) of N.H.8A Section: Sayla-Chotila-Bamanbore Bagodara - Limbdi - Bamanbore Road. (Four Lane) |
Executive Engineer National Highway Division Rajkot |
4 Months |
1969.35 |
8 |
|
Construction of 2 cell of Land fild site at village Nakaravadi Ta. and Dist. Rajkot |
Rajkot Municipality |
18 Months |
1577.30 |
9 |
|
Construction of Railway Over Bridges in lieu of busy Level Crossings including Approaches and Service Roads in State of Gujarat LC-41 Vadodara-Godhra / Panchmahal |
G.R.B.D.C.L. (GHV INDIA PVT. LTD.) |
12 Months |
1571.52 |
10 |
|
Strengthning & Widening of Thasara - Pipalwada - Sandheli - Porda. Ch : 0/00 to 15/950 ( MDR ). Ta : Thasara Dist : Kheda |
Executive Engineer R & B Panchayat Division Nadiad. |
12 Months |
1044.42 |
11 |
|
Strengthening to Dhandhuka-Dholera Road Km. 0/0 to 27/0 (Agreement No.B-2/19/2012-13) |
Executive Engineer R & B Division, Ahmedabad |
12 Months |
1000.51 |
12 |
|
Constg. Various road under B.O.W. (N) I.No. 32 in Shahera Taluka, Pkg. No. 15-16/06 |
Executive Engineer, Panchayat R&B Division Godhra |
11 Months |
899.83 |
13 |
|
Widening and Strengthening Halvad-Sara Road km.9/5 to 25/8 and Renuwal / Resurfacing to Halvad-Sara road km 0/0 to 25/8 (Widening upto 5.50mt to 7.0mt) |
Executive Engineer R and B Division Surendranagar |
12 Months |
858.16 |
14 |
|
Construction and Erection of Engineered Landfill Facility, Patan Municipality of District Patan of the State of Gujarat.( CONTRACT No. : GUDC / MSWM / SLF / 06 ) |
Managing Director GUDC Gandhinagar |
12 Months |
779.27 |
15 |
|
Improvement of various road under Nabard Yojana RIDF - 14 Ta. Dhandhuka Dist. Ahmedabad Package No. AHD/NBD/02 |
PIU and Executive Engineer R and B Division Ahmedabad |
12 Months |
720.42 |
16 |
|
Dhandhuka Barwala road SH No.36 K m 105/0 to 137/8 (Selected Length) Providing 37.5 mm B.S.G, 50mm BM 25mm SDBC, Hard side shoulder, road furniture work |
Executive Engineer R & B Division, Ahmedabad |
12 Months |
666.68 |
17 |
|
Viramgam - Vadhwan - Surendranagar road Km.60/0 to 71/6 (Widening of road from Two lan 7.0 mt to 10 mt ) (Agreement No.B-2/47/2010-11) |
Executive Engineer R & B Division, Ahmedabad |
12 Months |
649.33 |
18 |
|
Dismantiling of existing boundary wall & Construction of RCC boundary wall at CTF Ankleshwar |
S.E. Civil O.N.G.C. Ankleshwar |
18 Months |
587.16 |
19 |
|
Construction and Erection of Engineered Landfill Facility for Viramgam Municipality of District Ahmedabad of the State of Gujarat.( CONTRACT No. : GUDC / MSWM / SLF / 04 ) |
Managing Director GUDC Gandhinagar |
12 Months |
509.49 |
20 |
|
Construction of Double and Intermediate Lane Asphalt roads, SWD, Pipe CD works, Water Supply Distribution Lines and street light work at "Women's Park", Bol (Sanand-II) Indl. Estate, Phase - I. |
Executive Engineer GIDC, Ahmedabad |
6 months |
505.50 |
21 |
|
Widening and Strengthening of Barmer - Sanchor-Gujarat Border (upto Gandhav Bridge) section of NH-15 to Construction of Service Road in Existing Four Lane from Ch. 153.000 to ch. 157.000, Two Lane with Paved Shoulder from Ch. 157.000 to Ch. 245.505 and Four Lane from Ch. 245.505 to Ch. 259.300 under NHDP-IV in the State of Rajasthan |
National Highways Authority of India (Montecarlo Limited ) |
30 Months |
34380.00 |
22 |
|
Balance work of four laning from Km 94.00 to Km 123.00 of Nagpur - Hyderabad Section of NH-7 in the State of Maharashtra on Item Rate Mode Construction Contract Package NS-60(MH) Bal-2 |
National Highways Authority of India (GHV INDIA PVT. LTD. ) |
24 Months |
20204.23 |
23 |
|
District to District: Bagodara Dhandhuka Barwala Road Km. 61/4 to 105/0. (Widening up to 10 Mtr.) |
Executive Engineer, R and B Division, Ahmedabad |
27 Months |
12200.00 |
24 |
|
Construction four lanes Road Dabhoi Tilakwada Road (Km. 31/0 to 50/0 through EPC contract |
Executive Engineer, District R&B Division, Vadodara |
24 Months |
7337.34 |